Monday, April 21, 2008

Constrution on Gordon Ave


Here is a photo of the overall building showing :
*Pre-cast concrete Panels
*Columns and Mullions
*Perlins and Rafters
*And Wall Panel Bracing.



This next photo shows:
*Pre-cast panel connection to another panel
*Bracing to the Pre-cast panel
*And some sort of manufactured Decking bundled ready to be installed.



This Photo Shows two Ferrules, most likely to have been used when the panel was being
craned into position.



This last photo shows a close up of the Starter Bars in a brick and concrete footing.