This photo shows a small section of suspended ceiling. showing the rods to hold the plaster board and the services which the ceiling hides.


This photo show the rafters (universal beams) connecting to the precast concrete wall.


This photo shows the rafter and the 'CHS' connection to the mullion.


This photo show the precast panel fixed to the column using a 'UB' to space and fix the two together giving the concrete more rigidity.

This photo show the connection between to columns, one being smaller than the other. Steel plate used to pack out the difference between the two.

This photo show the columns and bearers.


Pre cast stairs are used in the fire escape.